1
/
of
8
Vesgantti
Vesgantti 85'' Chenille Couch for Living Room, 3 Seater Comfy Sofa with Wide Armrest, Thick Spring Cushions, Modern Cloud Couch for Apartment, Office, Bedroom, Small Space, Dark Grey
Vesgantti 85'' Chenille Couch for Living Room, 3 Seater Comfy Sofa with Wide Armrest, Thick Spring Cushions, Modern Cloud Couch for Apartment, Office, Bedroom, Small Space, Dark Grey
Regular price
$521.99 USD
Regular price
Sale price
$521.99 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
About This
- Premium Chenille Fabric & Easy Care: This chenille couch is upholstered in high-quality chenille fabric, which is soft, skin-friendly, wear-resistant and durable, not easy to wrinkle or deform, with a soft color that won’t fade even after long-term use. As an ideal choice for couches for living room, its sofa cover is removable and machine washable, easy to take care of daily, ensuring your comfortable sofa couch stays new and durable in daily use.
- Perfect Balance of Softness & Support: This sofa couch features cushions with a spring system and high-elastic sponge, providing stable and firm support without sinking. Unlike all-sponge sofas that lack support, this cloud couch offers great resilience and long-lasting comfort. The back pillows are filled with soft cotton to gently wrap your neck, shoulders, and waist, delivering a cloud-like feel that is soft but not saggy, ideal for prolonged sitting and relaxing.
- 85 Inch Oversized Comfort Design: This 85 inch couch features a 21.6-inch deep seat cushion, a 17-inch perfect seat height, allowing your feet to rest naturally and your waist to fit perfectly with the backrest, so that your entire legs and hips can be softly wrapped. Equipped with 7.5-inch wide armrests, it serves as both a comfortable pillow and an easily accessible storage platform, making relaxation effortless. It’s a perfect sofa couch and chenille couch for your living room.
- Sturdy Wooden Frame & Long-Lasting Durability: Crafted with a solid wooden frame, this living room couch has excellent load-bearing capacity and durability, not easy to deform or sink after long-term use. Compared with one-piece compressed foam, the multi-layer structure of wooden frame combined with layered sponge offers better breathability, stronger support and longer service life, making it more comfortable for home use. It’s one of the most reliable couches for daily use.
- Easy & Quick Assembly: This sofa couch is shipped in a single package, specially designed for easy assembly. The interfaces are accurately connected, ensuring stable splicing, simple operation and few installation steps, no complicated tools required, saving time and effort. Even if you are a beginner in furniture assembly, you can finish assembling this modern chenille couch within 20 minutes, making it an ideal choice for busy households.
- Warm Notes: The cushions of this cloud couch are vacuum-packed to ensure efficiency during transportation. To restore their fluffy and full shape, simply pat them gently by hand or let them stand for 48 hours after taking them out—this process allows the high-rebound foam and cotton to naturally regain elasticity, ensuring your living room couch present the best appearance and touch.
Overview
- Brand : Vesgantti
- Assembly Required : Yes
- Seat Depth : 21.7 inches
- Seat Height : 17 Inches
- Weight Limit : 900 Pounds
- Seating Capacity : 3.0
- Product Dimensions : 32.7"D x 85"W x 34.7"H
- Item Weight : 101.5 Pounds
- Type : Standard
- Color : Dark Grey
Share
